Location: Culver City, California
Project Type: Former Military Plant
Contact: Mr. Steve Murow - The Moote Group

(714) 751-5557
Project Value: $6,775,000
Status: August 2000 - September 2001
Hygienist: Environmental Engineering and Construction

Scope of Work
This complex and environmentally sensitive project focused on preparing 2.5 miles of old roads to be redeveloped into 21st century roads with a completely new below ground infrastructure. Our work included removing and recycling 1,400 tons of steel; 30,000 tons of asphalt and concrete; 400 tons of asbestos materials, lead paint abatement and repainting a historic building. The project also included lead and hydrocarbon soil excavations and disposal, monitoring well abandonment and complete building demolitions. Heavy equipment such as Excavators, Loaders, Dockers and 35-ton rock trucks were utilized throughout the project. Work was completed with zero loss in time and a recycling rate of 99.54%.










home | services | key personnel | project profile | current projects | recently completed projects
insurance and banking | company profile | resources | contact us

miller environmental, inc. ©2004-2009
2210 South Dupont Drive
Anaheim, CA 92806
(714) 385-0099
(714) 385-0011 Fax