Project Profile: Cal Poly Pomona - Bldg. 13
 
 Project Profiles
3711 Long Beach
Playa Vista
Hiro Building
Abbey Center
Pt. Loma - SPAWAR
Cal Poly Pomona
Moreno Valley
JPL
Central Los Angeles High School #1
Covina High School
Playa Vista Fresh Water Marsh
Playa Vista Test Site 2

Location: Cal Poly Pomona
Project Type: University Educational Facility
Contact: Mr. Ken Misumi - Nielsen Dillingham Builders

(562) 626-9667
Project Value: $129,510
Status: Scheduled Completion - January 2002
Hygienist: H2 Environmental

Scope of Work
With the completion of the new $17,000,000 Engineering Facility, our client, Nielsen Dillingham, was contracted to remodel Building 13.

Prior to the design build remodel, Miller Environmental, Inc. was contracted to remove asbestos floor tile, fireproofing, ceiling tiles, pipe insulation and provide interior and structural demolition. The demolition ranged from breaking and removing concrete to soil excavation for the new elevator. All work was completed on schedule.


home | services | key personnel | project profile | current projects | recently completed projects
insurance and banking | company profile | resources | contact us

miller environmental, inc. ©2004-2009
2210 South Dupont Drive
Anaheim, CA 92806
(714) 385-0099
(714) 385-0011 Fax